Filing excerpt
We expect sales volume to be relatively flat to slightly down compared to prior year as a result of a fire at our Talison joint venture’s third chemical grade plant in Greenbushes (“CGP3”), offset by strong integrated production, stronger than expected spodumene sales from our Wodgina joint venture and our ability to operate with lower inventory levels. Remediation from the impact of the CGP3 fire, with ramp up to normal production levels, is expected to be completed in the second half of 2026.