Filing excerpt
Orders for manufactured commercial HVAC equipment, electrical switch gear, and large application power generators have experienced the longest lead-times, and it is not uncommon for lead-times to be greater than six months.
Long lead times for essential components like HVAC equipment, electrical switchgear, and power generators are disrupting project schedules and potentially increasing costs, creating a need for better supply chain visibility and procurement solutions.
Filing excerpt
Orders for manufactured commercial HVAC equipment, electrical switch gear, and large application power generators have experienced the longest lead-times, and it is not uncommon for lead-times to be greater than six months.
What this signalsFilings often name leadership changes, deals and spending plans.
Vendors
Regions named
sec-10ksupplyChainDisruptionGet every 10-K signal for Comfort Systems USA and the companies you sell to, in the tools you already use.
Connect Autobound to Claude, Claude Code or Cursor with MCP. Then ask: “What changed at Comfort Systems USA this week?”
The Signal API returns 10-K signals for any list of companies as JSON, for your CRM, warehouse or app.
Sign up and spend your free credits on the companies you sell to.
This page shows a preview. The full sec-10k record in the Signal API and MCP can also have these 8 fields. Some fields are empty for some signals.
Company
linkedin_urlValue in the APIindustriesValue in the APIemployee_count_lowValue in the APIemployee_count_highValue in the APIrevenueValue in the APIdescriptionValue in the APISignal
signal_nameValue in the APIassociationValue in the APIGET /v1/signals/ec28f802-a4ce-4f6b-ae4a-fc8d6d62cab2 returns this record as JSON. POST /v1/companies/enrich returns every signal for comfortsystemsusa.com.
{
"signal_id": "ec28f802-a4ce-4f6b-ae4a-fc8d6d62cab2",
"signal_type": "sec-10k",
"signal_subtype": "supplyChainDisruption",
"detected_at": "2026-02-24T09:24:59.956+00:00",
"company": {
"name": "Comfort Systems USA",
"domain": "comfortsystemsusa.com"
},
"data": {
"detail": "Long lead times for essential components like HVAC equipment, electrical switchgear, and power generators are disrupting project schedules and potentially increasing costs, creating a need for better supply chain visibility and procurement solutions.",
"metrics": {
"timeframe": "current_year"
},
"summary": "Experiencing lead times greater than six months for critical HVAC and electrical equipment",
"excerpts": "Orders for manufactured commercial HVAC equipment, electrical switch gear, and large application power generators have experienced the longest lead-times, and it is not uncommon for lead-times to be greater than six months.",
"relevance": 0.9,
"sentiment": "negative",
"confidence": "high",
"source_url": "https://www.sec.gov/Archives/edgar/data/1035983/000110465926017530/fix-20251231x10k.htm",
"filing_date": "2026-02-19",
"filing_year": 2026,
"sales_relevance": "Supply chain tools urgently needed",
"signal_category": "operations",
"regions_mentioned": [
"United States"
],
"vendors_mentioned": [
"Trane",
"Carrier",
"York",
"Daikin",
"Baltimore Aircoil",
"SPX",
"Schneider Electric",
"Eaton"
]
}
}
curl https://signals.autobound.ai/v1/signals/ec28f802-a4ce-4f6b-ae4a-fc8d6d62cab2 \
-H "X-API-KEY: $AUTOBOUND_API_KEY"curl -X POST https://signals.autobound.ai/v1/companies/enrich \
-H "X-API-KEY: $AUTOBOUND_API_KEY" \
-H "Content-Type: application/json" \
-d '{"domain":"comfortsystemsusa.com","limit":20}'Long text fields are shortened on this page.
Looking up one signal by its id is free. Enrich costs 2 credits per signal returned; a call with no results is free.