At June 30, 2026, SCE's recorded estimated minimum liability to remediate its 19 identified material sites (sites with a liability balance at June 30, 2026, in which the upper end of the range of expected costs is at least $1 million) was $218 million, including $146 million related to San Onofre. In addition to these sites, SCE also has 14 immaterial sites with a liability balance as of June 30, 2026, for which the total minimum recorded liability was $5 million.