Filing excerpt
...the definition of CCRMUs includes on-site areas where CCR was beneficially used. This is contrary to the 2015 CCR Rule which exempted beneficial uses that met certain criteria.
A 2024 EPA rule expands the definition of regulated coal waste, creating uncertainty and requiring Entergy to re-evaluate its sites for potential corrective action. With a facility evaluation report deadline in February 2027, the company is under pressure to assess this liability, likely driving spending on environmental engineering and compliance management solutions.
Filing excerpt
...the definition of CCRMUs includes on-site areas where CCR was beneficially used. This is contrary to the 2015 CCR Rule which exempted beneficial uses that met certain criteria.
What this signalsFilings often name leadership changes, deals and spending plans.
Regions named
sec-10qmanufacturingIssueGet every 10-Q signal for Entergy and the companies you sell to, in the tools you already use.
Connect Autobound to Claude, Claude Code or Cursor with MCP. Then ask: “What changed at Entergy this week?”
The Signal API returns 10-Q signals for any list of companies as JSON, for your CRM, warehouse or app.
Sign up and spend your free credits on the companies you sell to.
This page shows a preview. The full sec-10q record in the Signal API and MCP can also have these 8 fields. Some fields are empty for some signals.
Company
linkedin_urlValue in the APIindustriesValue in the APIemployee_count_lowValue in the APIemployee_count_highValue in the APIrevenueValue in the APIdescriptionValue in the APISignal
signal_nameValue in the APIassociationValue in the APIGET /v1/signals/3f8193c5-36f8-44e6-9b8e-b522470bcbd8 returns this record as JSON. POST /v1/companies/enrich returns every signal for entergy.com.
{
"signal_id": "3f8193c5-36f8-44e6-9b8e-b522470bcbd8",
"signal_type": "sec-10q",
"signal_subtype": "manufacturingIssue",
"detected_at": "2026-08-04T07:05:19.792+00:00",
"company": {
"name": "Entergy",
"domain": "entergy.com"
},
"data": {
"detail": "A 2024 EPA rule expands the definition of regulated coal waste, creating uncertainty and requiring Entergy to re-evaluate its sites for potential corrective action. With a facility evaluation report deadline in February 2027, the company is under pressure to assess this liability, likely driving spending on environmental engineering and compliance management solutions.",
"metrics": {
"timeframe": "current_year"
},
"summary": "Entergy faces new EPA rules and 2027 deadline for Coal Combustion Residuals (CCR) management",
"excerpts": "...the definition of CCRMUs includes on-site areas where CCR was beneficially used. This is contrary to the 2015 CCR Rule which exempted beneficial uses that met certain criteria.",
"relevance": 0.8,
"sentiment": "negative",
"confidence": "high",
"source_url": "https://www.sec.gov/Archives/edgar/data/7323/000006598426000283/etr-20260630.htm",
"filing_date": "2026-07-31",
"filing_year": 2026,
"fiscal_year": 0,
"fiscal_year_end": "06/30",
"sales_relevance": "Operations optimization needed",
"signal_category": "operations",
"regions_mentioned": [
"Arkansas",
"Louisiana",
"Mississippi",
"Texas"
]
}
}
curl https://signals.autobound.ai/v1/signals/3f8193c5-36f8-44e6-9b8e-b522470bcbd8 \
-H "X-API-KEY: $AUTOBOUND_API_KEY"curl -X POST https://signals.autobound.ai/v1/companies/enrich \
-H "X-API-KEY: $AUTOBOUND_API_KEY" \
-H "Content-Type: application/json" \
-d '{"domain":"entergy.com","limit":20}'Long text fields are shortened on this page.
Looking up one signal by its id is free. Enrich costs 2 credits per signal returned; a call with no results is free.