Skip to main content
FlexPatent grant

Flex was granted a patent for managing peak power loads.

What happened

In September 2026 Flex patented battery-backed power management for facilities and equipment that need steadier electricity during demand spikes.

Source

patents.google.comSep 15, 2026

US patent US12738741

Power systems and control methods to address peak loading

Abstract

A power system includes an energy storage system having a rechargeable energy storage element and a converter connected to the rechargeable energy storage element and configured to connect to a bus so that the energy storage system is connected in parallel with a load and a main power supply system. The energy storage system may cooperate with the main power supply system to supply power to the load with each of the energy storage system and the main power supply system configured as a voltage source with a corresponding droop function. The system may include a control circuit configured to monitor a voltage of the bus and control the converter to either charge or discharge the rechargeable energy storage element based on the voltage of the bus.

patents.google.com/patent/US12738741Read the full source

Extracted by Autobound

From the Signal API record
Signal
Patent grant

What this signalsA new patent often shows where a company is putting its R&D budget.

Grant date
Sep 15, 2026
Inventors
4
Patent number
US12738741
Assignee
Flex Ltd.

The full record

From the Signal API record

People

  • James P. NovakInventor
  • Yi Yuan ChungInventor
  • Alexei TikhonskiInventor
  • James E. NelsonInventor
  • Guy RazInventor
  • Igor PavlovskyInventor

Details

Primary CPC class
H02J 3/28
USPTO assignee
Flex Ltd.
What the invention does
A rechargeable battery and converter work alongside the main power source to share load demand and reduce strain when usage peaks.

Topics and mentions

Tags

  • Intellectual Property
  • Research & Development
  • Energy / Power
  • Engineering

Technologies named

  • energy storage
  • power converters
  • peak-load management

Extraction

Detected
Sep 20, 2026
signal_type
patents-company
signal_subtype
patentGrant

Use this data

Get every patent signal for Flex and the companies you sell to, in the tools you already use.

  1. Ask Claude about it

    Connect Autobound to Claude, Claude Code or Cursor with MCP. Then ask: “What changed at Flex this week?”

  2. Send it to your own tools

    The Signal API returns patent signals for any list of companies as JSON, for your CRM, warehouse or app.

  3. Try it free

    Sign up and spend your free credits on the companies you sell to.

    Start Free1,000 free credits

The API returns more than this page shows

This page shows a preview. The full patents-company record in the Signal API and MCP can also have these 8 fields. Some fields are empty for some signals.

Company

  • linkedin_urlValue in the API
  • industriesValue in the API
  • employee_count_lowValue in the API
  • employee_count_highValue in the API
  • revenueValue in the API
  • descriptionValue in the API

Signal

  • signal_nameValue in the API
  • associationValue in the API
Show the full JSONThe record on this page and the API request

GET /v1/signals/4010bbb9-7d40-5796-ab2f-a82a877bd9da returns this record as JSON. POST /v1/companies/enrich returns every signal for flex.com.

{
  "signal_id": "4010bbb9-7d40-5796-ab2f-a82a877bd9da",
  "signal_type": "patents-company",
  "signal_subtype": "patentGrant",
  "detected_at": "2026-09-20T18:10:03+00:00",
  "company": {
    "name": "Flex",
    "domain": "flex.com"
  },
  "data": {
    "cpc": [
      {
        "code": "H02J 3/28"
      },
      {
        "code": "H02J 3/01"
      },
      {
        "code": "H02J 7/06"
      },
      {
        "code": "H02J 7/865"
      },
      {
        "code": "H02J 2207/50"
      }
    ],
    "tags": [
      "Intellectual Property",
      "Research & Development",
      "Energy / Power",
      "Engineering"
    ],
    "detail": "In September 2026 Flex patented battery-backed power management for facilities and equipment that need steadier electricity during demand spikes.",
    "summary": "Flex was granted a patent for managing peak power loads.",
    "event_at": "2026-09-15",
    "inventors": [
      {
        "name": "James P. Novak",
        "status": "resolved",
        "is_primary": true,
        "linkedin_url": "https://www.linkedin.com/in/jamie-novak-9030501"
      },
      {
        "name": "Yi Yuan Chung",
        "status": "resolved",
        "is_primary": false,
        "linkedin_url": "https://www.linkedin.com/in/yi-yuan-chung-399322128"
      },
      {
        "name": "Alexei Tikhonski",
        "status": "resolved",
        "is_primary": false,
        "linkedin_url": "https://www.linkedin.com/in/alexei-tikhonski-97b8a74"
      },
      {
        "name": "James E. Nelson",
        "status": "resolved",
        "is_primary": false,
        "linkedin_url": "https://www.linkedin.com/in/jim-nelson-58aaa3b"
      },
      {
        "name": "Guy Raz",
        "status": "unresolved",
        "is_primary": false
      },
      {
        "name": "Igor Pavlovsky",
        "status": "resolved",
        "is_primary": false,
        "linkedin_url": "https://www.linkedin.com/in/igor-pavlovsky-14173555"
      },
      {
        "name": "Robert L. Myers",
        "status": "unresolved",
        "is_primary": false
      },
      {
        "name": "Pei Chiao Chung",
        "status": "unresolved",
        "is_primary": false
      }
    ],
    "event_kind": "grant_date",
    "grant_date": "2026-09-15",
    "source_url": "https://patents.google.com/patent/US12738741",
    "cpc_primary": {
      "code": "H02J 3/28"
    },
    "patent_title": "Power systems and control methods to address peak loading",
    "patent_number": "US12738741",
    "uspto_assignee": "Flex Ltd.",
    "patent_abstract": "A power system includes an energy storage system having a rechargeable energy storage element and a converter connected to the rechargeable energy storage element and configured to connect to a bus so that the energy storage system is connected in parallel with a load and a main power supply system. The energy storage system may cooperate with the main power supply system to supply power to the load with each of the energy storage system and the main power supply system configured as a voltage source with a corresponding droop function. The system may include a control circuit configured to monitor a voltage of the bus and control the converter to either charge or discharge the rechargeable energy storage element based on the voltage of the bus.",
    "precision_class": "structural",
    "invention_explanation": "A rechargeable battery and converter work alongside the main power source to share load demand and reduce strain when usage peaks.",
    "technologies_mentioned": [
      "energy storage",
      "power converters",
      "peak-load management"
    ]
  }
}

Long text fields are shortened on this page.

Looking up one signal by its id is free. Enrich costs 2 credits per signal returned; a call with no results is free.