Filing excerpt
Since 2023, the traditional electric operating companies have contracted with new data centers and other large load customers covering approximately nine GWs of electric load, with each contract individually representing a maximum annual electric load greater than 100 MWs, that have been signed by the parties and/or reviewed by the state regulatory commissions.