Filing excerpt
In addition, on March 23, 2026, our Port Arthur Refinery experienced a fire in one of its distillate hydrotreater units, which prompted a full shut-down of the refinery. The refinery resumed operations in April 2026 at reduced throughput rates and returned to normal throughput rates during the second quarter. As a result of the outage and the phased restart of the processing units, the refinery’s throughput volumes during the second quarter of 2026 were lower than typical throughput rates.