Skip to main content
Valero Energy10-Q: Manufacturing issue

Port Arthur Refinery fire prompted full shutdown and lowered second quarter 2026 throughput volumes

Source: Autobound Signal API · 62 signals tracked for Valero Energy · updated

Get Valero Energy's live signals in Claude or ChatGPT, or by API

AskWhat changed at Valero Energy this week? Use Autobound signals for valero.com.

What happened

On March 23, 2026, the Port Arthur Refinery experienced a distillate hydrotreater fire leading to a full shutdown, with operations resuming in April at reduced rates before returning to normal throughput during Q2 2026.

Source

SEC EDGARJul 30, 2026

Quarterly report (Form 10-Q)

Valero Energy 10-Q for Quarter ended Jun 30, 2026

Filing excerpt

In addition, on March 23, 2026, our Port Arthur Refinery experienced a fire in one of its distillate hydrotreater units, which prompted a full shut-down of the refinery. The refinery resumed operations in April 2026 at reduced throughput rates and returned to normal throughput rates during the second quarter. As a result of the outage and the phased restart of the processing units, the refinery’s throughput volumes during the second quarter of 2026 were lower than typical throughput rates.

sec.gov/Archives/edgar/data/1035002/000162828026050937/vlo-20260630.htmRead the full source

Other signals in this filing (2)

Extracted by Autobound

From the Signal API record
Signal
10-Q: Manufacturing issue

What this signalsFilings often name leadership changes, deals and spending plans.

Period
Quarter ended Jun 30, 2026
Fiscal year end
06/30
Filed
Jul 30, 2026

More 10-Q signals at other companies

The full record

From the Signal API record

Details

CIK
1035002
Accession number
0001628280-26-050937
Timeframe
Current quarter
Quarter
Q2
Filing year
2026
Period end date
Jun 30, 2026
Why it matters
Operations optimization needed
Signal category
Operations

Extraction

Confidence
High
Relevance
85%
Sentiment
Negative
Detected
Nov 9, 2026
signal_type
sec-10q
signal_subtype
manufacturingIssue

Use this data

Get every 10-Q signal for Valero Energy and the companies you sell to, in the tools you already use.

  1. Ask Claude about it

    Connect Autobound to Claude, Claude Code or Cursor with MCP. Then ask: “What changed at Valero Energy this week?”

  2. Send it to your own tools

    The Signal API returns 10-Q signals for any list of companies as JSON, for your CRM, warehouse or app.

  3. Try it free

    Sign up and spend your free credits on the companies you sell to.

    Start Free1,000 free credits

The API returns more than this page shows

This page shows a preview. The full sec-10q record in the Signal API and MCP can also have these 8 fields. Some fields are empty for some signals.

Company

  • linkedin_urlValue in the API
  • industriesValue in the API
  • employee_count_lowValue in the API
  • employee_count_highValue in the API
  • revenueValue in the API
  • descriptionValue in the API

Signal

  • signal_nameValue in the API
  • associationValue in the API
Show the full JSONThe record on this page and the API request

GET /v1/signals/02bf25aa-8d19-4821-a1ba-bb9223feb97f returns this record as JSON. POST /v1/companies/enrich returns every signal for valero.com.

{
  "signal_id": "02bf25aa-8d19-4821-a1ba-bb9223feb97f",
  "signal_type": "sec-10q",
  "signal_subtype": "manufacturingIssue",
  "detected_at": "2026-11-09T06:30:46.314+00:00",
  "company": {
    "name": "Valero Energy",
    "domain": "valero.com"
  },
  "data": {
    "detail": "On March 23, 2026, the Port Arthur Refinery experienced a distillate hydrotreater fire leading to a full shutdown, with operations resuming in April at reduced rates before returning to normal throughput during Q2 2026. This operational incident may create opportunities for maintenance, safety, and refinery asset integrity solution providers.",
    "metrics": {
      "timeframe": "current_quarter"
    },
    "quarter": "Q2",
    "summary": "Port Arthur Refinery fire prompted full shutdown and lowered second quarter 2026 throughput volumes",
    "excerpts": "In addition, on March 23, 2026, our Port Arthur Refinery experienced a fire in one of its distillate hydrotreater units, which prompted a full shut-down of the refinery. The refinery resumed operations in April 2026 at reduced throughput rates and returned to normal throughput rates during the second quarter. As a result of the outage and the phased restart of the processing units, the refinery’s throughput volumes during the second quarter of 2026 were lower than typical throughput rates.",
    "relevance": 0.85,
    "sentiment": "negative",
    "confidence": "high",
    "source_url": "https://www.sec.gov/Archives/edgar/data/1035002/000162828026050937/vlo-20260630.htm",
    "filing_date": "2026-07-30",
    "filing_year": 2026,
    "fiscal_year": 2026,
    "fiscal_year_end": "06/30",
    "period_end_date": "2026-06-30",
    "sales_relevance": "Operations optimization needed",
    "signal_category": "operations"
  }
}

Long text fields are shortened on this page.

Looking up one signal by its id is free. Enrich costs 2 credits per signal returned; a call with no results is free.