Filing excerpt
Through 2030, we expect to make significant capital expenditures to improve our electric and natural gas utility infrastructure, with a major portion directed to our transmission and distribution systems, as well as generation and battery storage facilities that align with the 2025 Change to the 2023 PRP discussed above.