What FirstEnergy's Quarter ended Sep 30, 2026 10-Q says: 6 signals

FirstEnergy filed its latest 10-Q with the SEC on Oct 28, 2026. It discusses capacity constraint, capex increase and compliance burden.

Public (FE)Utilities10,000+ employeesfirstenergycorp.comLinkedIn

Get FirstEnergy's live signals in Claude or ChatGPT, or by API

AskWhat changed at FirstEnergy this week? Use Autobound signals for firstenergycorp.com.
Filed
Oct 28, 2026
Period
Quarter ended Sep 30, 2026
Filings
3
Signals
15

Source: Autobound Signal API · 75 signals tracked for FirstEnergy · updated

10-Q · latest 10

What FirstEnergy's 10-Q filings say

  1. 10-Q · Quarter ended Sep 30, 2026

    Filed · 6 signals

    SEC EDGAR
  2. 10-Q · Quarter ended Jun 30, 2026

    Filed · 5 signals

    SEC EDGAR
  3. 10-Q · Quarter ended Mar 31, 2026

    Filed · 4 signals

    SEC EDGAR

Showing 10 of 15 filing signals. The Signal API returns all of them.

Get them with one API call

Earnings calls

FirstEnergy earnings headlines

From earnings call transcripts (Signal API type earnings-transcripts).

Earnings call headlines
Call dateWhat the company said
Transmission investment plan increasing at least 25% from $19BGrowing electricity demand and regional reliability needs will drive at least a 25% increase in the current $19 billion transmission investment plan when the updated five-year plan is released. Through September 2026, capital deployment has already increased 23% year-over-year to $4.9 billion across the system. The transmission increase will heavily focus on shoring up existing grid...
Five-year $36B investment plan funded with equity through 2030The company reaffirmed its five-year $36 billion base investment plan through 2030, supported by up to $2 billion of equity or equity-like securities. Additional capital outlays for West Virginia generation and transmission expansions will be financed with up to 35% equity or equity-like instruments. Comprehensive updates detailing the 2027-2031 capital plan will be released in February 2027.
Industrial load up 3.3% led by manufacturing and data centersThird-quarter total weather-adjusted load grew 1.2%, marking positive growth in four consecutive quarters. Expansion was led by the industrial class, which jumped 3.3% in Q3 and 2.1% over the trailing 12-month period. Growth was driven by manufacturing strength in metals, oil and gas, and chemicals, combined with accelerating data center demand.
Issued request for proposal for 3 GW combined-cycle generationAn RFP has been initiated for an initial 3 GW of additional combined-cycle generation capacity to serve data center load growth. Management is also pursuing bridge power alternatives including reciprocating engines, fuel cells, and batteries for near-term speed to power.
Turbines reserved with Siemens for delivery in 2030Turbines have been reserved with Siemens for delivery in 2030 to protect the project schedule for the proposed Maidsville facility. Other major equipment and EPC contracts are planned to be finalized shortly after regulatory approval.
Contracted data center demand reached 7.9 GW across footprintContracted data center load expanded by 90% since year-end to reach 7.9 GW across the operating footprint. An additional pipeline of approximately 4 GW remains under active negotiation.

Signal API · MCP

Track FirstEnergy with the Signal API

One POST /v1/companies/enrich call with firstenergycorp.com returns FirstEnergy 10-Q signals (sec-10q), each with its source. Or ask Claude through MCP.

2 credits per signal returned; zero-result calls are free. Endpoint reference

curl -X POST https://signals.autobound.ai/v1/companies/enrich \
  -H "X-API-KEY: $AUTOBOUND_API_KEY" \
  -H "Content-Type: application/json" \
  -d '{"domain":"firstenergycorp.com","signal_types":["sec-10q"],"limit":20}'

Bulk data

Need this signal for 10,000+ companies?

Get a free sample file or a bulk feed (API, GCS push, flat file). The sample is real 10-Q Filings records, as a CSV.

Talk to sales

Same industry

Questions about FirstEnergy 10-Q

When did FirstEnergy file its latest 10-Q?
FirstEnergy filed its latest 10-Q (Quarter ended Sep 30, 2026) on Oct 28, 2026. The one before it was filed on Jul 28, 2026.
What did FirstEnergy disclose in its latest 10-Q?
From the filing dated Oct 28, 2026: FirstEnergy expands 2026-2030 Energize365 investment plan by 25% to $36 billion
What did FirstEnergy say on its recent earnings calls?
Q3 FY2026: Transmission investment plan increasing at least 25% from $19B (dated Oct 28, 2026).
Where can I read FirstEnergy's 10-Q filing?
The full filing is on SEC EDGAR: https://www.sec.gov/Archives/edgar/data/53456/000103129626000144/fe-20260930.htm. This page summarizes what the filing says and links to it.

Page updated , the date of the newest row on this page.

Source. Quarterly reports (Form 10-Q) filed with the SEC. Every card links to the filing on EDGAR.

Method. Insights are extracted from the filing text and grouped by category. Numbers are quoted from the filing.