What Freeport-McMoRan's Quarter ended Sep 30, 2026 10-Q says: 4 signals
Freeport-McMoRan filed its latest 10-Q with the SEC on Nov 6, 2026. It discusses capex increase, data investment and manufacturing issue.
Get Freeport-McMoRan's live signals in Claude or ChatGPT, or by API
What changed at Freeport-McMoRan this week? Use Autobound signals for fcx.com.- Filed
- Nov 6, 2026
- Period
- Quarter ended Sep 30, 2026
- Filings
- 3
- Signals
- 11
Source: Autobound Signal API · 51 signals tracked for Freeport-McMoRan · updated
10-Q · latest 10
What Freeport-McMoRan's 10-Q filings say
- SEC EDGAR
10-Q · Quarter ended Sep 30, 2026
Filed · 4 signals
PTFI Operations Incur $934 Million in Idle Facility and Restoration Costs Year-to-Date 2026
Freeport-McMoRan incurred $934 million in idle facility, direct recovery, and restoration costs for the first nine months of 2026 following an external mud rush incident at PTFI in September 2025.
$934M
idle facility, direct recovery and restoration costs associated with PTFI's September 2025 external mud rush incident for first nine months of 2026
Freeport-McMoRan Board Approves $4.5 Billion Expansion and Modernization at Bagdad Copper Mine
Freeport-McMoRan's Board approved a $4.5 billion expansion and modernization program at its Bagdad operation in northwest Arizona to more than double mining and milling rates.
$4.5B
expansion and modernization program at Bagdad copper and molybdenum operation
milling
Freeport Incorporates Data Analytics into Leaching to Expand Copper Production to 300 Million Pounds
FCX is incorporating new applications, technologies, and data analytics into leaching processes across U.S.
data analytics
Investigation Continues into Potential FCPA Violations at Indonesia Joint Venture PT Smelting
FCX is investigating whether activities of PT Smelting, an Indonesian JV between PTFI and Mitsubishi Materials Corporation, violated the FCPA or non-U.S.
- SEC EDGAR
10-Q · Quarter ended Jun 30, 2026
Filed · 4 signals
DOJ FCPA investigation into PT Smelting activities continues after SEC closed inquiry
Freeport-McMoRan engaged outside counsel to investigate whether activities of Indonesian joint venture PT Smelting violated the FCPA or other laws.
Grasberg Block Cave ramp-up after external mud rush drives $1.2B projected 2026 idle facility costs
PTFI experienced an external mud rush incident in September 2025 at the Grasberg Block Cave underground mine, requiring ongoing phased ramp-up and resulting in expected idle facility and restoration costs of approximately $1.2 billion for 2026.
$1.2B
projected idle facility and restoration costs for 2026 associated with the Grasberg Block Cave ramp-up
Freeport-McMoRan expects $4.3 billion in 2026 CapEx, including $3.0 billion for major projects
The company expects capital expenditures of $4.3 billion for 2026, comprising $3.0 billion for major projects and $1.3 billion for sustaining capital.
Unit site production and delivery costs rose to $3.28 per pound of copper in Q2 2026
Consolidated unit site production and delivery costs for copper mines averaged $3.28 per pound in Q2 2026 compared to $2.71 per pound in Q2 2025, driven by higher costs for supplies, diesel fuel, and other consumables.
- SEC EDGAR
10-Q · Quarter ended Mar 31, 2026
Filed · 3 signals
Grasberg Block Cave mud rush disruption causes $1.3B in estimated 2026 idle facility costs
PTFI experienced a mud rush incident at the Grasberg Block Cave underground mine, resulting in $406 million of idle facility and restoration costs in Q1 2026 and an expected $1.3 billion for full-year 2026.
$1.3B
expected idle facility and restoration costs for the year 2026 associated with the Mud Rush Incident
DOJ investigating PT Smelting activities; SEC decided against enforcement action on March 17, 2026
Freeport-McMoRan engaged outside counsel to investigate whether activities of Indonesian joint venture PT Smelting violated the FCPA or other laws, voluntarily notifying the SEC and DOJ.
Showing 10 of 11 filing signals. The Signal API returns all of them.
Get them with one API callEarnings calls
Freeport-McMoRan earnings headlines
From earnings call transcripts (Signal API type earnings-transcripts).
| Call date | What the company said |
|---|---|
| Scaling proprietary leaching technology to reach 800M lbs by 2030The company is advancing an innovative leaching initiative utilizing next-generation proprietary additives to recover copper from low-grade ores previously deemed unrecoverable. Lab testing demonstrated incremental recoveries four times greater than initial additives, with commercial quantities being manufactured for field deployment in 2027. The company targets scaling leaching production... | |
| CapEx outlook raised to $5.2B for 2027Capital expenditure estimates were raised by $400 million above the July forecast to approximately $5.2 billion for 2027, driven by mining equipment investments and cost inflation. 2026 CapEx is also estimated to approximate $4.4 billion, a 2% increase from prior estimates. This expansion represents major vendor opportunities in mining equipment, industrial machinery, and infrastructure support. | |
| Energy cost inflation increases operational expenses by $500MRising energy prices, particularly diesel and electricity, increased operating costs by approximately $500 million compared with 2025. The company consumes about 275 million gallons of diesel annually across operations in the U.S. (100M), Peru (80M), and Indonesia. Sulfuric acid prices have also more than doubled, creating cost pressure in U.S. operations where the company is a net buyer. | |
| Bagdad mine expansion evaluated at $4.5B CapExThe company expects a formal board investment decision on the $4.5 billion Bagdad 2X expansion project in the fourth quarter. The project will double concentrator capacity and add 200 million to 250 million pounds of copper annually over a 3.5-year construction schedule. Substantial opportunities exist for EPC contractors, prefabrication suppliers, autonomous fleet providers, and process... | |
| Automated rail and automated haul trucks deployedUpgrades to the automated rail material handling system at Grasberg Block Cave are currently underway and scheduled for completion into early 2027. Concurrently, autonomous haul trucks have been deployed at the Bagdad mine in Arizona to counter tight labor markets and scale operations efficiently. Suppliers of autonomous driving systems, rail control software, and industrial automation... | |
| Copper sales guidance lowered 2% for 2026The company adjusted 2026 copper sales guidance downward by approximately 2% due to operational shortfalls and weather in the U.S. and Chile. Expected 2027 sales volumes were also trimmed by 2.5% to reflect updated mine plans. Operational challenges in open-pit sequencing and severe weather create demand for mine planning, slope monitoring, and fleet management optimization software. |
Signal API · MCP
Track Freeport-McMoRan with the Signal API
One POST /v1/companies/enrich call with fcx.com returns Freeport-McMoRan 10-Q signals (sec-10q), each with its source. Or ask Claude through MCP.
2 credits per signal returned; zero-result calls are free. Endpoint reference
curl -X POST https://signals.autobound.ai/v1/companies/enrich \
-H "X-API-KEY: $AUTOBOUND_API_KEY" \
-H "Content-Type: application/json" \
-d '{"domain":"fcx.com","signal_types":["sec-10q"],"limit":20}'Bulk data
Need this signal for 10,000+ companies?
Get a free sample file or a bulk feed (API, GCS push, flat file). The sample is real 10-Q Filings records, as a CSV.
Same industry
10-Q at related companies
Questions about Freeport-McMoRan 10-Q
When did Freeport-McMoRan file its latest 10-Q?
What did Freeport-McMoRan disclose in its latest 10-Q?
What did Freeport-McMoRan say on its recent earnings calls?
Where can I read Freeport-McMoRan's 10-Q filing?
Page updated , the date of the newest row on this page.
Source. Quarterly reports (Form 10-Q) filed with the SEC. Every card links to the filing on EDGAR.
Method. Insights are extracted from the filing text and grouped by category. Numbers are quoted from the filing.
Data as of .