Skip to main content
Kairos PowerFacility expansion

Kairos Power gets up to $100M from Samsung group to build nuclear reactor for Google

What happened

Kairos Power is building two nuclear reactors, Hermes 1 and Hermes 2, in Oak Ridge, Tennessee, with the latter expected to begin operating in 2030.

Source

Article excerpt

Highlighted: the sentence this signal was extracted from

Kairos Power has picked engineering firm Samsung C&T to help build its 50 megawatt demonstration reactor for Google, which the nuclear startup is aiming to have completed by 2030. As part of the deal, Samsung C&T will make an equity investment in Kairos and provide "in-kind" engineering services, the combination of which is worth up to $100 million, Kairos Power said Monday. The equity investment will make up $70 million of the total, a Kairos spokesperson told TechCrunch. Samsung C&T has built or helped build about a dozen nuclear reactors around the globe. Kairos is part of a wave of nuclear startups that have benefited from the surge in power demand from AI data centers. Google first signed a deal with the company in fall 2024, calling on Kairos to build nuclear reactors capable of generating about half a gigawatt of electricity by 2035. Currently, Kairos is building two reactors in Oak Ridge, Tennessee. The first, Hermes 1, is a low-power demonstrator that will help the company refine its commercial design. The second, Hermes 2, is Kairos's first commercial-scale reactor. Output from Hermes will count as the first 50 megawatts of its deal with Google. The startup received approval from the Nuclear Regulatory Commission to build the reactors in November 2024. It expects Hermes 2 to begin operating in 2030, in line with its original agreement with Google. Hermes 2 will...

Keep reading with a free account

The rest of this article, and every signal for Kairos Power, is in your free account.

Extracted by Autobound

From the Signal API record
Event
Facility expansion

What this signalsA bigger facility often needs new equipment, systems and services.

Location
Oak Ridge, Tennessee, United States

More facility expansion signals at other companies

The full record

From the Signal API record

Details

Assets
nuclear reactors

Topics and mentions

Asset tags

  • production
  • energy

Extraction

Confidence
90%
Detected
Sep 21, 2026
signal_type
news
signal_subtype
expands_facilities

Use this data

Get every facility expansion signal for Kairos Power and the companies you sell to, in the tools you already use.

  1. Ask Claude about it

    Connect Autobound to Claude, Claude Code or Cursor with MCP. Then ask: “What changed at Kairos Power this week?”

  2. Send it to your own tools

    The Signal API returns facility expansion signals for any list of companies as JSON, for your CRM, warehouse or app.

  3. Try it free

    Sign up and spend your free credits on the companies you sell to.

    Start Free1,000 free credits

The API returns more than this page shows

This page shows a preview. The full news record in the Signal API and MCP can also have these 8 fields. Some fields are empty for some signals.

Company

  • linkedin_urlValue in the API
  • industriesValue in the API
  • employee_count_lowValue in the API
  • employee_count_highValue in the API
  • revenueValue in the API
  • descriptionValue in the API

Signal

  • signal_nameValue in the API
  • associationValue in the API
Show the full JSONThe record on this page and the API request

GET /v1/signals/830bf547-804a-533c-69e0-e94af69b2ecf returns this record as JSON. POST /v1/companies/enrich returns every signal for kairospower.com.

{
  "signal_id": "830bf547-804a-533c-69e0-e94af69b2ecf",
  "signal_type": "news",
  "signal_subtype": "expands_facilities",
  "detected_at": "2026-09-21T18:23:05+00:00",
  "company": {
    "name": "Kairos Power",
    "domain": "kairospower.com"
  },
  "data": {
    "url": "https://techcrunch.com/2026/09/21/kairos-power-gets-up-to-100m-from-samsung-group-to-build-nuclear-reactor-for-google/",
    "title": "Kairos Power gets up to $100M from Samsung group to build nuclear reactor for Google",
    "assets": "nuclear reactors",
    "author": "Tim De Chant",
    "excerpt": "Kairos Power has picked engineering firm Samsung C&T to help build its 50 megawatt demonstration reactor for Google , which the nuclear startup is aiming to have completed by 2030. As part of the deal, Samsung C&T will make an equity investment in Kairos and provide “in-kind” engineering services, the combination of which is worth up to $100 million, Kairos Power said Monday. The equity investment will make up $70 million of the total, a Kairos spokesperson told TechCrunch. Samsung C&T has built or helped build about a dozen nuclear reactors around the globe. Kairos is part of a wave of nuclear startups that have benefited from the surge in power demand from AI data centers. Google first signed a deal with the company in fall 2024 , calling on Kairos to build nuclear reactors capable of generating about half a gigawatt of electricity by 2035. Currently, Kairos is building two reactors in Oak Ridge, Tennessee. The first, Hermes 1, is a low-power demonstrator that will help the company refine its commercial design. The second, Hermes 2, is Kairos’s first commercial-scale reactor. Output from Hermes will count as the first 50 megawatts of its deal with Google. The startup received approval from the Nuclear Regulatory Commission to build the reactors in November 2024. It expects Hermes 2 to begin operating in 2030, in line with its original agreement with Google. Hermes 2 will be...",
    "summary": "Kairos Power is building two nuclear reactors, Hermes 1 and Hermes 2, in Oak Ridge, Tennessee, with the latter expected to begin operating in 2030.",
    "location": "Oak Ridge, Tennessee, USA",
    "planning": true,
    "image_url": "https://techcrunch.com/wp-content/uploads/2024/10/GettyImages-531153042-e1729096517914.jpeg?resize=1200,660",
    "confidence": 0.9,
    "assets_tags": [
      "production",
      "energy"
    ],
    "published_at": "2026-09-21T18:23:05Z",
    "location_data": [
      {
        "city": "Oak Ridge",
        "state": "Tennessee",
        "region": "Northern America",
        "country": "United States",
        "continent": "Americas",
        "fuzzy_match": false
      }
    ],
    "article_sentence": "Currently, Kairos is building two reactors in Oak Ridge, Tennessee."
  }
}

Long text fields are shortened on this page.

Looking up one signal by its id is free. Enrich costs 2 credits per signal returned; a call with no results is free.