Filing excerpt
Mississippi Crossing projectProject is designed to transport up to 2.1 Bcf/d of natural gas through the construction of approximately 208 miles of 42-inch and 36-inch pipeline and three new compressor stations. Project will originate near Greenville, Mississippi, and terminates near Butler, Alabama, with connections to the existing TGP system and third-party pipelines. Supported by long-term contracts.Expected in-service date is second quarter 2028.$1,703 million