What Kinder Morgan's FY2025 10-K says: 12 signals
Kinder Morgan filed its latest 10-K with the SEC on Feb 13, 2026. It discusses capacity constraint, market expansion and capex increase.
Public (KMI)Oil and Gas10,000+ employeeskindermorgan.comLinkedIn
- Filed
- Feb 13, 2026
- Period
- FY2025
- Fiscal year end
- 12/31
- Filings
- 1
10-K · latest 10
What Kinder Morgan's 10-K filings say
- SEC EDGAR
10-K · FY2025
Filed · Fiscal year ends 12/31 · 12 signals
KMI details over $7.9B in multi-year capital expansion projects through 2030
The company has a massive backlog of large-scale pipeline and facility construction projects, including the $1.83B South System Expansion and the $1.8B Trident pipeline.
$7.9B
Sum of KMI's share of capital scope for 12 major announced natural gas pipeline projects scheduled for completion between 2026 and 2030.
Committing over $5.3B to three major pipeline projects to address capacity constraints through 2029
KMI is investing $5.33 billion in the South System Expansion 4 ($1.83B), Trident Intrastate pipeline ($1.8B), and Mississippi Crossing project ($1.7B) to significantly increase natural gas transport capacity.
$5.3B
Capital scope for three major pipeline expansion projects (South System Expansion 4, Trident Intrastate, Mississippi Crossing)
Launching $1.83B South System Expansion project through 2029
$1.8B
Capital scope for South System Expansion 4 project
Completed $648M acquisition of North Dakota gas system in Feb 2025
Kinder Morgan acquired a natural gas gathering and processing system from Outrigger Energy II, indicating significant capital deployment and potential needs for integrating new assets, systems, and personnel.
$648M
Acquisition of a natural gas gathering and processing system in North Dakota
Outrigger Energy II
Committing $1.8B to new Trident Intrastate pipeline project by 2028
The company is building a new 216-mile pipeline in Texas for nearly $1.8 billion, representing a major capital initiative that will require extensive resources, technology, and services for construction and operation to serve the LNG and industrial corridor.
$1.8B
Capital scope for Trident Intrastate pipeline project
LNG
Investing $1.7B in Mississippi Crossing pipeline project, in-service by Q2 2028
This $1.7 billion project involves constructing a 208-mile pipeline and three new compressor stations, signaling a massive, long-term investment requiring significant third-party support for engineering, materials, and operational technology.
$1.7B
Capital scope for Mississippi Crossing project
Secured long-term contract with TVA for new $231M pipeline project
Kinder Morgan is building a new 32-mile, $231M pipeline to serve a new Tennessee Valley Authority (TVA) power generation facility.
$231M
Capital scope for TVA Cumberland project
Tennessee Valley Authority (TVA)
Won major contract to serve Venture Global’s Plaquemines LNG facility
KMI placed a two-phase, $661M project into service to provide 2 Bcf/d of natural gas transportation to Venture Global's Plaquemines LNG facility.
$661M
Capital scope for Evangeline Pass projects serving Venture Global
LNGVenture Global
KMI advancing over $550M in projects for 2026 completion, creating near-term needs
Several capital projects are scheduled to come online in 2026, including the $231M TVA Cumberland project and the $161M GCX pipeline expansion.
$550M
Combined capital scope for three major projects expected to be in-service during 2026.
Completed $382M divestiture of EagleHawk equity interest in Dec 2025
The sale of its 25% non-operated equity interest in EagleHawk provides Kinder Morgan with $382 million in capital, likely to be redeployed into core strategic projects or debt reduction, signaling a portfolio optimization strategy.
$382M
Proceeds from sale of 25% equity interest in EagleHawk
25%
Equity interest in EagleHawk sold
Showing 10 of 12 filing signals. The Signal API returns all of them.
Get them with one API callSignal API · MCP
Track Kinder Morgan with the Signal API
One POST /v1/companies/enrich call with kindermorgan.com returns Kinder Morgan 10-K signals (sec-10k), each with its source. Or ask Claude through MCP.
2 credits per signal returned; zero-result calls are free. Endpoint reference
curl -X POST https://signals.autobound.ai/v1/companies/enrich \
-H "X-API-KEY: $AUTOBOUND_API_KEY" \
-H "Content-Type: application/json" \
-d '{"domain":"kindermorgan.com","signal_types":["sec-10k"],"limit":20}'Same industry
10-K at related companies
Questions about Kinder Morgan 10-K
When did Kinder Morgan file its latest 10-K?
What does Kinder Morgan's latest 10-K say about capex increase?
Where can I find Kinder Morgan's annual report?
Source. Annual reports (Form 10-K) filed with the SEC. Every card links to the filing on EDGAR.
Method. Insights are extracted from the filing text and grouped by category. Numbers are quoted from the filing.
Data as of .