Skip to main content
BoringProduct launch

The Boring Company announced approval for 19 additional stations for its Vegas Loop underground transit system, bringing the network's planned total to 123 stations while 7 are currently operational.

Source: Autobound Signal API · 53 signals tracked for Boring · updated

Get Boring's live signals in Claude or ChatGPT, or by API

AskWhat changed at Boring this week? Use Autobound signals for boringcompany.com.

What happened

Post: "Boring Co.’s Vegas Loop announces approval of 19 additional stations, bringing total to 123"

Source

Comments on the post

5 of 10 comments
  • “Stations - parking lots”

    u/zedsmith18 points · Aug 26, 2026View

  • “So stupid. And to think in a few years, they're going to take over for the monorail.”

    u/Weekly-Law-254414 points · Aug 26, 2026View

  • “That's nothing, I just approved two whole Metro lines in my back yard and a multimodal hub in my basement.”

    u/metroliker11 points · Aug 26, 2026View

  • “Well the current number of operational stations is 7.”

    u/Itchy_Breadfruit435810 points · Aug 26, 2026View

  • “You could massively increase throughput by just running e-bikes through the tunnels”

    u/differing8 points · Aug 27, 2026View

Extracted by Autobound

From the Signal API record
Signal
Product launch

What this signalsUser posts often show product pain before it reaches reviews or churn.

Subreddit
r/transit
Stage
Confirmed
Event date
Aug 2026

The full record

From the Signal API record

Numbers

Mentions
1

Details

Timing
Planned
Virality
Very low
Post kind
Link
Prominence
Core
Company's role
Subject
Signal category
Event

Topics and mentions

Topics

  • infrastructure
  • expansion
  • transportation
  • transit

Flair

  • System Expansion

Products named

  • Vegas Loop

Extraction

Sentiment
Neutral
Detected
Aug 26, 2026
signal_type
reddit-company
signal_subtype
productLaunch

Use this data

Get every Reddit signal for Boring and the companies you sell to, in the tools you already use.

  1. Ask Claude about it

    Connect Autobound to Claude, Claude Code or Cursor with MCP. Then ask: “What changed at Boring this week?”

  2. Send it to your own tools

    The Signal API returns Reddit signals for any list of companies as JSON, for your CRM, warehouse or app.

  3. Try it free

    Sign up and spend your free credits on the companies you sell to.

    Start Free1,000 free credits

The API returns more than this page shows

This page shows a preview. The full reddit-company record in the Signal API and MCP can also have these 8 fields. Some fields are empty for some signals.

Company

  • linkedin_urlValue in the API
  • industriesValue in the API
  • employee_count_lowValue in the API
  • employee_count_highValue in the API
  • revenueValue in the API
  • descriptionValue in the API

Signal

  • signal_nameValue in the API
  • associationValue in the API
Show the full JSONThe record on this page and the API request

GET /v1/signals/69cb6a3c-1300-5a01-a7ca-21d81685be81 returns this record as JSON. POST /v1/companies/enrich returns every signal for boringcompany.com.

{
  "signal_id": "69cb6a3c-1300-5a01-a7ca-21d81685be81",
  "signal_type": "reddit-company",
  "signal_subtype": "productLaunch",
  "detected_at": "2026-08-26T23:18:23+00:00",
  "company": {
    "name": "Boring",
    "domain": "boringcompany.com"
  },
  "data": {
    "nsfw": false,
    "stage": "confirmed",
    "awards": 0,
    "timing": "planned",
    "topics": [
      "transit",
      "infrastructure",
      "expansion",
      "transportation"
    ],
    "post_id": "1vzd4vz",
    "summary": "The Boring Company announced approval for 19 additional stations for its Vegas Loop underground transit system, bringing the network's planned total to 123 stations while 7 are currently operational.",
    "comments": [
      {
        "url": "https://www.reddit.com/r/transit/comments/1vzd4vz/comment/p63yrcj/",
        "depth": 0,
        "score": 18,
        "author": "zedsmith",
        "excerpt": "Stations - parking lots",
        "posted_at": "2026-08-26T23:26:02.000Z",
        "author_url": "https://www.reddit.com/user/zedsmith/"
      },
      {
        "url": "https://www.reddit.com/r/transit/comments/1vzd4vz/comment/p63xzdz/",
        "depth": 0,
        "score": 14,
        "author": "Weekly-Law-2544",
        "excerpt": "So stupid.\n\n And to think in a few years, they're going to take over for the monorail.",
        "posted_at": "2026-08-26T23:21:59.000Z",
        "author_url": "https://www.reddit.com/user/Weekly-Law-2544/"
      },
      {
        "url": "https://www.reddit.com/r/transit/comments/1vzd4vz/comment/p63zrdj/",
        "depth": 0,
        "score": 11,
        "author": "metroliker",
        "excerpt": "That's nothing, I just approved two whole Metro lines in my back yard and a multimodal hub in my basement.",
        "posted_at": "2026-08-26T23:31:16.000Z",
        "author_url": "https://www.reddit.com/user/metroliker/"
      },
      {
        "url": "https://www.reddit.com/r/transit/comments/1vzd4vz/comment/p63zdno/",
        "depth": 0,
        "score": 10,
        "author": "Itchy_Breadfruit4358",
        "excerpt": "Well the current number of operational stations is 7.",
        "posted_at": "2026-08-26T23:29:16.000Z",
        "author_url": "https://www.reddit.com/user/Itchy_Breadfruit4358/"
      },
      {
        "url": "https://www.reddit.com/r/transit/comments/1vzd4vz/comment/p666pgu/",
        "depth": 0,
        "score": 8,
        "author": "differing",
        "excerpt": "You could massively increase throughput by just running e-bikes through the tunnels",
        "posted_at": "2026-08-27T08:05:50.000Z",
        "author_url": "https://www.reddit.com/user/differing/"
      },
      {
        "url": "https://www.reddit.com/r/transit/comments/1vzd4vz/comment/p63zd9f/",
        "depth": 0,
        "score": 4,
        "author": "FrivolousMe",
        "excerpt": "Look at my country dawg we're never getting another good city metro system built",
        "posted_at": "2026-08-26T23:29:13.000Z",
        "author_url": "https://www.reddit.com/user/FrivolousMe/"
      },
      {
        "url": "https://www.reddit.com/r/transit/comments/1vzd4vz/comment/p682pol/",
        "depth": 0,
        "score": 2,
        "author": "okay_sure_i_guess",
        "excerpt": "are locals upset about this? or not really bothered since it’s for tourists",
        "posted_at": "2026-08-27T14:51:36.000Z",
        "author_url": "https://www.reddit.com/user/okay_sure_i_guess/"
      }
    ],
    "evidence": [
      "[post] Boring Co.’s Vegas Loop announces approval of 19 additional stations, bringing total to 123",
      "[comment u/Itchy_Breadfruit4358] Well the current number of operational stations is 7."
    ],
    "link_url": "https://www.reviewjournal.com/local/traffic/boring-co-s-vegas-loop-announces-approval-of-19-additional-stations-bringing-total-to-123-3869704/",
    "virality": "very_low",
    "post_date": "2026-08-26T23:18:23.000Z",
    "post_kind": "link",
    "sentiment": "neutral",
    "subreddit": "transit",
    "event_date": "2026-08",
    "post_flair": [
      "System Expansion"
    ],
    "post_title": "Boring Co.’s Vegas Loop announces approval of 19 additional stations, bringing total to 123",
    "prominence": "core",
    "source_url": "https://www.reddit.com/r/transit/comments/1vzd4vz/boring_cos_vegas_loop_announces_approval_of_19/",
    "entity_role": "subject",
    "post_author": "reddit-frog-1",
    "upvote_ratio": 0.14,
    "mention_count": 1,
    "mention_surge": false,
    "subreddit_url": "https://www.reddit.com/r/transit/",
    "total_upvotes": 0,
    "comments_total": 10,
    "total_comments": 10,
    "post_author_url": "https://www.reddit.com/user/reddit-frog-1/",
    "signal_category": "event",
    "comments_included": 7,
    "products_mentioned": [
      "Vegas Loop"
    ]
  }
}

Long text fields are shortened on this page.

Looking up one signal by its id is free. Enrich costs 2 credits per signal returned; a call with no results is free.